Pana Community Hospital is undergoing major construction as they add a new patient services building to the existing hospital. The building will consist of a basement, two patient floors, and a mechanical room. E.L. Pruitt Co. provided trades in HVAC, Plumbing and Piping, and Fire Protection. Our Fire Protection division installed a 100% Schedule 40 Galvanized system along with one wet system and two protection zones. VAV systems, boilers, and chillers were installed along with hot water piping and chilled water piping. Air handler units and exhaust fans were placed on the roof for temperature control along with exhaust fans for proper ventilation. A brand new mechanical room houses the controls for all mechanical units along with ductwork and piping extending throughout the hospital's addition.